Design and construction of a 50,000T enclosed coal storage silo for CHN Energy power plant, replacing open stockpiles to meet environmental regulations.

CHN Energy 50,000T Coal Storage Silo EPC Project

Jun Thu, 2026

Project Background

CHN Energy needed to replace open coal stockpiles at their 2x660MW power plant with enclosed storage to comply with new air quality regulations.

Solution Design

  • Silo: 40m diameter x 35m height, flat bottom with multi-point screw reclaimer
  • Fire prevention: CO monitoring, temperature sensors, N2 inerting, water spray
  • Discharge: 16-point screw reclaimer grid, 1,000 tph reclaim rate
  • Control: Integrated with plant DCS for seamless coal feed

Outcome

  • Dust emissions reduced by 98%
  • Coal loss from weather reduced from 3% to less than 0.1%
  • Zero self-ignition incidents in 2 years
  • ROI achieved in 3.5 years
Share
جدول المحتويات

إرسال الاستفسار

PDF
Download File

Manxing Industrial Silo Brochure

Manxing_Industrial_Silo_Brochure.pdf
Open the download form to unlock this file. The download will start automatically after submission.
المنتجات ذات الصلة
طلب عرض سعر
نحن ملتزمون بتقديم خدمة استثنائية لك وضمان تجربة شراء سلسة. يرجى إرسال استفسارك إلينا، وسنرد عليك بعرض سعر مفصل.
احصل على عرض أسعار مجاني

    *اسم

    *البريد الإلكتروني

    *هاتف

    دولة

    *رسالة

    X