معلومات عنا
نظام الصومعة
حلول
نظام تسليم المفتاح
فيديو
قضية
Service
مدونة
Engineering Capability
اتصال
قضية
EPC delivery of a slag cement mixing plant for POSCO Group including 1,000T slag silo, 3,000T cement silo, and continuous blending system.

POSCO Slag Cement Mixing Plant EPC Project in South Korea

Jun Thu, 2026

Project Overview

POSCO Group contracted Manxing to design and build a slag cement mixing plant at their Pohang facility, blending GGBS with OPC cement to produce premium blended cement.

System Design

  • Slag storage: 1x1,000T spiral steel silo with aeration pads
  • Cement storage: 1x3,000T bolted steel silo with fluidizing system
  • Blending: Continuous gravimetric blending with loss-in-weight feeders
  • Output: 80 tph blended cement to packaging line
  • Control: PLC-based recipe management with real-time monitoring

Key Achievement

Blending system achieved plus/minus 0.8% ratio accuracy, exceeding the plus/minus 1.5% specification, enabling consistent GGBS cement meeting Korean KS L 5210 standard.

Share
جدول المحتويات

إرسال الاستفسار

PDF
Download File

Manxing Industrial Silo Brochure

Manxing_Industrial_Silo_Brochure.pdf
Open the download form to unlock this file. The download will start automatically after submission.
المنتجات ذات الصلة
طلب عرض سعر
نحن ملتزمون بتقديم خدمة استثنائية لك وضمان تجربة شراء سلسة. يرجى إرسال استفسارك إلينا، وسنرد عليك بعرض سعر مفصل.
احصل على عرض أسعار مجاني

    *اسم

    *البريد الإلكتروني

    *هاتف

    دولة

    *رسالة

    X