О нас
Силосная система
Решения
Система «под ключ»
Видео
Случай
Service
Блог
Engineering Capability
Контакт
Случай
EPC delivery of a slag cement mixing plant for POSCO Group including 1,000T slag silo, 3,000T cement silo, and continuous blending system.

POSCO Slag Cement Mixing Plant EPC Project in South Korea

Jun Thu, 2026

Project Overview

POSCO Group contracted Manxing to design and build a slag cement mixing plant at their Pohang facility, blending GGBS with OPC cement to produce premium blended cement.

System Design

  • Slag storage: 1x1,000T spiral steel silo with aeration pads
  • Cement storage: 1x3,000T bolted steel silo with fluidizing system
  • Blending: Continuous gravimetric blending with loss-in-weight feeders
  • Output: 80 tph blended cement to packaging line
  • Control: PLC-based recipe management with real-time monitoring

Key Achievement

Blending system achieved plus/minus 0.8% ratio accuracy, exceeding the plus/minus 1.5% specification, enabling consistent GGBS cement meeting Korean KS L 5210 standard.

Share
Оглавление

Отправить запрос

PDF
Download File

Manxing Industrial Silo Brochure

Manxing_Industrial_Silo_Brochure.pdf
Open the download form to unlock this file. The download will start automatically after submission.
Сопутствующие товары
Запросить расценки
Мы стремимся предоставить вам исключительный сервис и обеспечить беспрепятственный опыт покупки. Пожалуйста, отправьте нам ваш запрос, и мы ответим с подробной сметой.
Получите бесплатную оценку стоимости

    *Имя

    *Эл. адрес

    *Телефон

    Страна

    *Сообщение

    X